Saturday progress

theinfill

Couple of day’s workings

theinfill doll's house blog - Medieval/Tudor/Jacobean - Facade of  Elizabethan-Jacoben Long Gallery Attempt at Green Man style face and a look at the rest of this floor’s frontage

theinfill doll's house blog - Medieval/Tudor/Jacobean - Facade of  Elizabethan-Jacoben Long Gallery and from ground’s eye view, as it were. It’s v comfy lying on this floor 😉

And I do promise that I will try to get something done with the other bits of the frontage asap after I’ve done bedroom #2.

The totally untouched ‘store room’ is supposed to be a chapel accessed off the sitting room, (and is presently storing all the bits that may or may not be used therein). The entrance below it has to have an outer section built on, well at least in my imagination it has, which hopefully will include the stair landing window etc.  Which would bring me back to the point at which all this started.

Now I really am going to work on the figures for the long gallery.

View original post

Advertisements

About notewords

Guitarist, Music teacher, Writer
This entry was posted in Uncategorized. Bookmark the permalink.

One Response to Saturday progress

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s